Hi Community members,
I have some requirements to build a BPM process and several UI screens for that BPM process alongside some other UI screens directly from SAP ECC. Expectation is to have all UI screens launched through a single launchpad preferably Fiori launchpad. Now I need some suggestions as to which system to use to keep the data used for the UI screens and also utilised for the BPM processes (like some User login info, several texts, some value help info and feedback info etc.).
Should i create an additional DB in SAP PO or should I create a DB in the Gateway HUB (we have a separate GW hub system rather than utilising from ECC or PO) or should I get the data from the ECC DB. If I use the DB for the later two (GW or ECC), will I have to reflect the same info in the PO box for the BPM process?
Any proper industry standard suggestions here would be appreciated.
Regards.