PI 7.1 to PO 7.41 migration

$
0
0

Hi team,

 

We are planning to migrate our Middleware system from PI 7.1 to PO 7.41. As we have plenty of interfaces, we are planning to do the migration in phases. Meaning running PI and PO both systems in production running parallelly.

 

to do so i have few questions. I really appreciate if you can help me in those questions.

 

1. Do we need to have 2 parallel SLDs too? each for PI and PO?

2. Do we need to select the interfaces to migrate as per the systems? eg. i have 15 interfaces for ECC (using IDOC, RFC and ABAP Proxy), do i have to select all those 15 interfaces at a time to migrate from PI to PO? or can i take them in batches of 5 and do the periodic migration?

 

Reason for asking this is i saw that i can only configure 1 integration engine in ECC at a time.

 

3. We have many interfaces with Axis adapter in PI, can i get rid of Axis adapter in PO?

 

Please help me understand this.

 

Thanks,

Hetal